The planned expansion of Champion Fiberglass’s facilities is on track, and our groundbreaking will be taking place soon. The addition of a third production line will functionally double our output and allow us to meet growing demand. The third production line will feature advancements including a double winder (vs. our other two lines’ single winders), a 40-foot drying oven and 12-foot quench tank (doubling the lengths of those of Lines 1 and 2), and a faster puller system.
Once Line 3 is operational and functioning at its maximum output, we’ll be retrofitting Lines 1 and 2 with these advancements. These upgrades are just one feature of our commitment to greater production capability, speed, and quality.
Recent Blogs
How to Calculate Electrical Labor Cost
By Scott Patchan Estimating labor costs is essential – labor can have a significant impact on an electrical project’s bottom…
Rep Ambassador: Gumersell Cashdan’s Mike Frobosilo
Meet Mike Frobosilo, Technical Sales Specialist for Gumersell-Cashdan, a seasoned agency with over 90 years in the electrical industry, serving…
Introducing the 2025 Summer Interns
At Champion Fiberglass®, we’re always excited to train the next generation. It’s important to us to pass along valuable lessons…








