In the electrical conduit market, marine environments offer sun, sea and the occasional unique installation. That was just the case at Washington, D.C.’s Reagan National Airport.
Enhancements to lighting along a runway pier over the brackish waters of the Potomac River necessitated upgraded conduit strong enough to withstand the elements. Other conduits were considered, but none provided the lightweight nature of Champion Fiberglass conduit, while also maintaining the strength and integrity required to endure corrosive saltwater and sun exposure.
Imagine lifting a nearly 100 lb. piece of conduit overhead from a raft. That’s what was required of this job, so a comparable 8 lb. piece of fiberglass conduit at the same length was a welcome relief.
Learn more about how this complex coastal installation was made fast, smooth and less costly for this customer.
Recent Blogs
How to Calculate Electrical Labor Cost
By Scott Patchan Estimating labor costs is essential – labor can have a significant impact on an electrical project’s bottom…
Rep Ambassador: Gumersell Cashdan’s Mike Frobosilo
Meet Mike Frobosilo, Technical Sales Specialist for Gumersell-Cashdan, a seasoned agency with over 90 years in the electrical industry, serving…
Introducing the 2025 Summer Interns
At Champion Fiberglass®, we’re always excited to train the next generation. It’s important to us to pass along valuable lessons…